Skip to content
  • Sports
  • Politics
  • Technology
  • Layout
  • Contact
  • View Pro
northsouthblock.news

northsouthblock.news

Indian Bureaucracy News

  • Home
  • BUREAUCRACY
  • PSU
  • News
  • Politics
  • Sports
  • Contact Us
  • ABOUT US
  • Privacy Policy
  • Sitemap
  • EDITORIAL
  • Toggle search form

Delhi Govt Clears Metro Phase V(A) After Centre’s Nod; 3 New Corridors to Boost Connectivity

Posted on February 12, 2026February 12, 2026 By northsouthblock No Comments on Delhi Govt Clears Metro Phase V(A) After Centre’s Nod; 3 New Corridors to Boost Connectivity

In a major push to Delhi’s public transport expansion, the Delhi government has approved Phase V(A) of the Delhi Metro project following clearance from the Centre. The project, estimated at Rs 12,014.91 crore, includes three new corridors aimed at strengthening connectivity across key parts of the national capital.

By NSB.News

The Delhi Cabinet, chaired by Chief Minister Rekha Gupta, on Wednesday approved Phase V(A) of the Delhi Metro project, marking a significant step in the capital’s infrastructure development. The decision comes after the Centre gave its nod to the expansion plan, which includes three strategic corridors.

Chief Minister Gupta said the project, estimated at Rs 12,014.91 crore, will substantially strengthen and modernise Delhi’s public transport network. The Delhi government will contribute Rs 2,940.46 crore towards the total project cost.

Thanking Prime Minister Narendra Modi for his support, Gupta said the project aligns with his “7-C Vision” of mobility — Common, Connected, Convenient, Congestion-free, Charged, Clean and Cutting-edge. She emphasised that strengthening public transport is essential to reducing congestion and improving air quality in the city.

The three approved corridors are: RK Ashram Marg to Indraprastha (via Central Vista), Tughlakabad to Kalindi Kunj, and Aerocity to Indira Gandhi Domestic Terminal-1. Of the 13 proposed stations under Phase V(A), 10 will be underground and three elevated.

The 9.91-km RK Ashram Marg–Indraprastha corridor will have nine stations and pass through the Central Vista area. It is expected to connect major administrative and cultural landmarks, including Kartavya Bhavan complexes, Shivaji Stadium, Central Secretariat, CCS Buildings, India Gate, War Memorial–High Court, Baroda House, Bharat Mandapam and Indraprastha. The corridor is likely to benefit around 60,000 government employees and nearly two lakh daily commuters. The estimated cost of this stretch is Rs 9,570.40 crore, with the Delhi government contributing Rs 2,337.24 crore.

The 2.26-km Aerocity–IGD Terminal-1 corridor will include one station and provide direct metro access to Indira Gandhi Domestic Airport Terminal-1. The project is expected to ease traffic congestion around the airport area. The estimated cost is Rs 1,419.64 crore, of which Rs 351.86 crore will be borne by the Delhi government.

Meanwhile, the 3.9-km Tughlakabad–Kalindi Kunj corridor will include three stations and improve connectivity in south and south-east Delhi. The estimated cost of this stretch is Rs 1,024.87 crore, with the Delhi government contributing Rs 251.36 crore.

With the approval of Phase V(A), the Delhi Metro network is set to expand further, reinforcing its role as the backbone of the city’s urban mobility system.

News

Post navigation

Previous Post: Oil India Q3 FY26 Standalone Profit Slumps 34% on Lower Crude Realisation; Dividend Raised
Next Post: Magenta Line to Become Delhi Metro’s Longest Corridor with Highest Interchanges and Underground Stations

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent News

  • IPS Sagar Singh Kalsi Appointed as Director in Ministry of Power on Lateral Shift Basis
    by northsouthblock
    September 18, 2026
    Sagar Singh Kalsi (IPS: 2010: AGMUT) has been appointed as Director in the Ministry of Power...

    Read More “IPS Sagar Singh Kalsi Appointed as Director in Ministry of Power on Lateral Shift Basis” »

  • IAS V Jaya Chandra Bhanu Reddy Repatriated to Parent Cadre on Personal Grounds
    by northsouthblock
    September 18, 2026
    New Delhi: Senior IAS officer V Jaya Chandra Bhanu Reddy (IAS: 2011: TN) has been prematurely...

    Read More “IAS V Jaya Chandra Bhanu Reddy Repatriated to Parent Cadre on Personal Grounds” »

  • IAS Officer Tukaram Mundhe Surpasses Maharashtra CM and Dy CM on Instagram Engagement
    by northsouthblock
    September 5, 2026
    Mumbai, September 5, 2026: Social media may not be a conventional performance yardstick for bureaucrats, but...

    Read More “IAS Officer Tukaram Mundhe Surpasses Maharashtra CM and Dy CM on Instagram Engagement” »

  • Six Senior IPS Officers Appointed to CRPF, BSF, CISF and IB; Major Senior-Level Reshuffle
    by northsouthblock
    September 5, 2026
    New Delhi, September 4, 2026: The Appointments Committee of the Cabinet (ACC) has approved the appointment...

    Read More “Six Senior IPS Officers Appointed to CRPF, BSF, CISF and IB; Major Senior-Level Reshuffle” »

  • Supreme Court Forms Five-Member Panel to Probe Violence During NEET-UG Paper Leak Protests
    by northsouthblock
    August 23, 2026
    The Supreme Court has constituted a five-member committee to investigate allegations of violence and police action...

    Read More “Supreme Court Forms Five-Member Panel to Probe Violence During NEET-UG Paper Leak Protests” »

Powered by PressBook WordPress theme